Working with Total Oil.
I contributed to over 400 architectural projects, (design lead for 50+) producing designs for new and modified petroleum forecourts ranging from installing vapour return connections on tank vents to full knock down and rebuild (KDRB) petrol stations over the course of my 8 years here.